Drivers heading in direction of Dali/Nissos are suggested to take the following exit in direction of Dali. Accordingly, drivers coming from Limassol are urged to make use of the junction quite than the GSP stadium
The Division of Public Works introduced that from 21:00 on the night of Friday, January 17, till 06:00 on the morning of Sunday, January 19, work might be carried out to interchange contraction/growth joints on the Almyros bridge of the Nicosia-Limesos freeway in each instructions , and that, through the execution of the works, the left lane of visitors in each instructions might be closed, for size roughly 500 meters, and visitors will move by the center and proper lanes.
In bulletins broadcast by the GTP, it’s acknowledged that the Division introduced that on Thursday, January 16, from 8:30 p.m. till 5:30 a.m. the next day, elimination and repainting of the prevailing street floor on the exit of the Nicosia freeway might be carried out- Limassol (A1), in direction of the Industrial Space of Latsia and that through the execution of the works, the doorway and exit from the freeway Nicosia-Limesos as much as the Megalo Alexandrou roundabout might be closed.
He provides that drivers heading in direction of Dali/Nissou are suggested to take the following exit in direction of Dali. Accordingly, drivers coming from Limassol are urged to make use of the junction quite than the GSP stadium.
In the course of the execution of the works, there might be applicable non permanent signage to make sure the graceful move of visitors within the numerous instructions, says the Division of Public Works, which apologizes for the unavoidable inconvenience that might be prompted and calls on the general public to point out the mandatory understanding and compliance with the non permanent street markings and the directions of the Police.
Supply: KYPE