That is the corporate “ACE LEONIDOU CONSTRUCTIONS LTD” which operates, amongst different issues, with the execution of formwork development works
The Labor Inspection Division of the Ministry of Labor and Social Insurance coverage introduced the conviction of two firms and the imposition of fines on each of them totaling 5.5 thousand euros for violations of the provisions of the laws on security and well being at work by the District Courtroom of Nicosia.
In a press release, the Division of Labor Inspection states that it has superior the felony prosecution of employers who violated the provisions of the laws on security and well being at work.
On account of the prosecution, as reported, the District Courtroom of Nicosia sentenced the corporate “ACE LEONIDOU CONSTRUCTIONS LTD”, which operates, amongst different issues, with the execution of formwork development works, to a wonderful of €4,000 for failing to put in an appropriate cowl, fastened and of enough power, in order that to successfully cowl a gap within the first flooring flooring and/or to put in strong railings to successfully enclose a gap within the first flooring flooring, of enough top, at the very least 1.10 meters from the ground, having a defend or different barrier at flooring degree of at the very least 0.15 meters, a handrail and horizontal component, in order that the space between a chest or different impediment and a handrail or different horizontal component doesn’t exceed 0.45 meters or use different equal means, to stop individuals from falling, leading to an worker of fall from a top of roughly 3.7 meters and be injured.
Additionally, it’s famous, the corporate omitted to outline the preventive and protecting measures that needed to be taken, primarily based on the written evaluation of the dangers present through the work and particularly the work, which associated to the development of formwork for pillars (pillars).
Apart from, based on the announcement, the District Courtroom of Nicosia sentenced the corporate “J&P AND J&P-AVAX JV – QATAR BUILDING” which is lively, amongst different issues, in development works, to a wonderful of €1,500 for failure to put in an appropriate cowl, fastened and of enough power, to successfully cowl a gap within the first flooring flooring and/or to put in strong railings to successfully enclose the opening within the first flooring flooring, of enough top, at the very least 1.10 meters from the ground, supplied with a defend or different barrier on the degree of the ground top at the very least 0.15 meters, a handrail and horizontal component, in order that the space between a breastplate or different impediment and a handrail or different horizontal component doesn’t exceed 0.45 meters or use different equal means, to stop individuals from falling.